Extras often come from unforeseen conditions or vague contracts. Once digging begins, contractors may find irrigation lines, old concrete, buried debris, or poor soil that require additional work. Without a clear agreement, these costs can be added to your bill. Common extras include hauling excess dirt, adding drainage solutions, or installing upgraded irrigation parts. In Utah, rocky soil is a frequent surprise that drives up excavation costs. The key is to review your contract for how “unforeseen conditions” are defined and priced. Ask the contractor to specify unit costs (per cubic yard of soil, per linear foot of pipe) so you’re not blindsided later. Also ask whether they’ll seek approval before charging for extras. Reputable contractors document change orders in writing and get your signature before proceeding. While some extras are unavoidable, many can be anticipated in advance by doing a thorough site walk with the contractor before work begins.
What will a landscape contractor charge extra for once they start digging?
Related FAQs
-
Should I water my landscaping in winter?
Yes, in many cases. Even when dormant, trees and shrubs still need moisture to survive Utah’s dry winters. If snowfall…
-
Will I regret choosing a particular landscape company?
If they’re licensed/insured, gave a clear bid tied to drawings, communicate weekly, and document changes, regret is unlikely. If you’re…
-
Is the lowest bid a trap from a landscaper?
It can be. A very low bid often means the contractor left out important items, plans to use inferior materials,…